ARC
ARC is Commonwealth Fusion Systems' planned first commercial tokamak power plant, at the Fall Line Fusion Power Station in Chesterfield County, Virginia. CFS says it aims to supply about 400 MW to the grid in the early 2030s.
- Operator
- Commonwealth Fusion Systems
- Type
- Power reactor
- Approach
- Tokamak
- Country
- US
- Status
- Planned
Design values
What the machine was built to do, as published. Not results, and never ranked.
| Parameter | Value | Unit | Status | Source |
|---|---|---|---|---|
| Net electrical capacity (design) medium confidence | 400 MW | MW | planned | ARC operator |