ARC

ARC is Commonwealth Fusion Systems' planned first commercial tokamak power plant, at the Fall Line Fusion Power Station in Chesterfield County, Virginia. CFS says it aims to supply about 400 MW to the grid in the early 2030s.

Type
Power reactor
Approach
Tokamak
Country
US
Status
Planned

Design values

What the machine was built to do, as published. Not results, and never ranked.

Design values for ARC
ParameterValueUnit StatusSource
Net electrical capacity (design) medium confidence 400 MW MW planned ARC operator