Commercial fission, dated.

14 fission power reactors are on record. 15 dated steps run from 2004–2026. HTR-PM demonstration plant, Shidao Bay connected to the grid on 20 December 2021.

A date is taken from the plant's timeline, or from a licensing decision that names the plant. Research reactors and fusion results stay on the timeline. Filings are on licensing.

Power reactors
14
Dated steps
15
On the grid
1

The plants

9 of the 14 have a stored date. A dash means that step has no stored date.

Fission power reactors and the dates stored for each
Plant Status ConstructionPermitCriticalityGridOperating licenceDenial
Prototype Fast Breeder Reactor Kalpakkam, India · Sodium fast reactor Completion was expected in 2010 when the project was sanctioned in September 2003; first criticality came in April 2026. Criticality date is from Wikipedia; no AERB, DAE or BHAVINI page could be opened (AERB reset the connection; BHAVINI returned 404). Commissioning 2004 — 6 April 2026 — — —
HTR-PM demonstration plant, Shidao Bay Rongcheng (Shidao Bay), China · High-temperature gas-cooled reactor Operating December 2012 — 12 September 2021 20 December 2021 — —
CAREM-25 CNEA · Lima (Zárate), Argentina · Pressurised water reactor Conflicting status: IAEA RRDB lists "CANCELLED"; Wikipedia (revised 2026-09-16) says construction is halted and the project "heavily paralyzed". No CNEA statement was opened. No status is assigned; slip history is in the description. No status recorded February 2014 — — — — —
BREST-OD-300 Seversk, Russia · Lead fast reactor Under construction 8 June 2021 — — — — —
Linglong One demonstration unit, Changjiang CNNC · Changjiang, China · Pressurised water reactor Under construction 13 July 2021 — — — — —
Aurora-INL Oklo · Idaho National Laboratory, United States · Sodium fast reactor DOE steps are reported by Oklo only; no DOE document was opened this run. Planned — — — — — 6 January 2022
Darlington New Nuclear Project Unit 1 Ontario Power Generation · Clarington, Canada · Boiling water reactor Licence to construct issued 2025-04-04 (CNSC). Ground-breaking date is Wikipedia's; site preparation preceded the licence to construct. Under construction December 2022 4 April 2025 — — — —
Kemmerer Power Station Unit 1 TerraPower · Kemmerer (Lincoln County), United States · Sodium fast reactor Construction permit CPAR-1 issued 2026-03-09 (NRC). Construction dates are from Wikipedia, not a regulator document. No operating licence. Under construction June 2024 23 April 2026 claimed 9 March 2026 — — — —
Palisades Nuclear Plant Holtec International · Covert Township (Van Buren County), United States NRC reauthorised power operation 2025-07-24. No source opened this run confirms the reactor has restarted or reconnected to the grid. Commissioning — — — — 24 July 2025 —

The dates

2004

  1. Construction start

    Prototype Fast Breeder Reactor

2012

  1. December 2012 · Construction start

    HTR-PM demonstration plant, Shidao Bay

2014

  1. February 2014 · Construction start

    CAREM-25

2021

  1. 8 June 2021 · Construction start

    BREST-OD-300

  2. 13 July 2021 · Construction start

    Linglong One demonstration unit, Changjiang

  3. 12 September 2021 · First criticality

    HTR-PM demonstration plant, Shidao Bay

  4. 20 December 2021 · Grid connection

    HTR-PM demonstration plant, Shidao Bay

2022

  1. 6 January 2022 · Application denied

    Aurora-INL

    NRC denies Aurora combined licence application

    achieved verified

  2. December 2022 · Construction start

    Darlington New Nuclear Project Unit 1

2024

  1. June 2024 · Construction start

    Kemmerer Power Station Unit 1

2025

  1. 4 April 2025 · Construction permit issued

    Darlington New Nuclear Project Unit 1

    CNSC licence to construct one BWRX-300 at the Darlington New Nuclear Project

    achieved verified

  2. 24 July 2025 · Operating licence issued

    Palisades Nuclear Plant

    Palisades: NRC reauthorises power operation (exemption, licence transfer and amendments to DPR-20)

    achieved verified

2026

  1. 9 March 2026 · Construction permit issued

    Kemmerer Power Station Unit 1

    NRC construction permit CPAR-1 issued for Kemmerer Power Station Unit 1 (Natrium)

    achieved verified

  2. 6 April 2026 · First criticality

    Prototype Fast Breeder Reactor

  3. 23 April 2026 · Construction start

    Kemmerer Power Station Unit 1

    Kemmerer Unit 1: nuclear construction begins (reported)

    claimed

Without a stored date

5 power reactors have a record here and no dated step in the table above.

Fission · Licensing · Timeline