Experimental Advanced Superconducting Tokamak
also EAST
EAST aims to contribute studies of plasma physics, provide a scientific basis for the design and construction of experimental reactors, including ITER, as EAST has shape and equilibrium similar to ITER.
Progression
- 403 s 2023
- 1,066 s 2025-01-20
- 1,000 s
Results
1,066 s Plasma duration claimed
measured 2025-01-20 · sustained · high confidence
403 s Plasma duration superseded
measured 2023 · sustained · high confidence
9.6 × 10¹⁸ m⁻³·keV·s Fusion triple product (nTτE) claimed
measured 2015 · shot 56933 · high confidence
2.1 keV Ion temperature claimed
measured 2015 · shot 56933 · peak · high confidence
8.5 × 10¹⁹ m⁻³ Plasma density claimed
measured 2015 · shot 56933 · high confidence
0.054 s Energy confinement time (τE) claimed
measured 2015 · shot 56933 · high confidence
Design values
What the machine was built to do, as published. Not results, and never ranked.
| Parameter | Value | Unit | Status | Source |
|---|---|---|---|---|
| Major radius medium confidence | 1.7 m | m | claimed | World Survey of Fusion Devices 2022 independent |
| Minor radius medium confidence | 0.4 m | m | claimed | World Survey of Fusion Devices 2022 independent |
| Plasma current medium confidence | 1 MA | MA | claimed | World Survey of Fusion Devices 2022 independent |
| On-axis magnetic field medium confidence | 3.5 T | T | claimed | World Survey of Fusion Devices 2022 independent |
| Plasma duration (nominal) medium confidence | 1,000 s | s | claimed | World Survey of Fusion Devices 2022 independent |