Pioneer Unit 2 (Palisades SMR-300)
also Pioneer 2
A planned Holtec SMR-300 at the Palisades Energy Center in Covert, Michigan. Part 1 of a phased construction permit application was docketed in February 2026 (Docket 50-617); no permit has been issued.
- Operator
- Holtec International
- Type
- Power reactor
- Approach
- PWR
- Country
- US
- Status
- Planned
Results
None recorded.