Construction permit issued

The regulator has authorised construction at a named site. The strongest pre-construction stage, and distinct from design approval, which is site-independent. It does not allow fuel to be loaded or the reactor to operate; that needs a later licence. Under the US combined-licence route, one licence covers both construction and operation.

Vocabulary id
regstage:construction-permit-issued
Scheme
Regulatory stages
Records using it
4

Recorded against 4

See licensing for the docket anchor behind each one.

Back to the glossary.