Skip to content
FusionBenchmark

Pakistan Atomic Energy Commission

also known as PAKISTAN ATOMIC ENERGY COMMISSION

Sector
Fusion

163 in this dataset

Headquarters
🇵🇰PK

1 organisations in PK

Status
Active
Role
Government programme, Operator

What these terms mean

Every classification on this page, defined. These are controlled-vocabulary terms, so the same word means the same thing on every profile.

Government programme
A state programme rather than a company: the funder, operator or coordinator of a national effort.
Operator
Runs a facility, which may have been built by someone else.
Fusion
Organizations pursuing energy from nuclear fusion, and their dedicated supply chain.

Where Pakistan Atomic Energy Commission sits

Composed from records in this dataset, not from outside research. Every figure below is counted from what the site holds, so it moves when the data does.

It operates 4 devices in this dataset, none of which carries recorded performance figures.

Measured results

Results recorded on this operator’s devices. Design parameters — bore, field, dimensions — are excluded: a machine’s size is not something it achieved. 9 design parameters are held on the device pages.

Measured results for Pakistan Atomic Energy Commission
DeviceMetric ValueStatusSource
GLAST-III Plasma current 0.002 MA claimed World Survey of Fusion Devices 2022
GLAST-III Plasma duration 0.0012 s claimed World Survey of Fusion Devices 2022
MT-1 Plasma current 0.015 MA claimed World Survey of Fusion Devices 2022
MT-1 Plasma duration 0.008 s claimed World Survey of Fusion Devices 2022
PST Plasma current 0.31 MA planned World Survey of Fusion Devices 2022

Devices operated 4

Sources

A source marked operator is the subject’s own publication. That is legitimate, and it is not independent confirmation. Methodology.