Skip to content
FusionBenchmark

Clinch River Nuclear Site Unit 1

also Clinch River BWRX-300, Clinch River SMR

A planned GE Vernova Hitachi BWRX-300 at TVA's Clinch River site in Oak Ridge, Tennessee. The NRC docketed the construction permit application (Docket 50-615) in July 2025; no permit has been issued.

Type
Power reactor
Approach
BWR
Country
US
Status
Planned

Design values

What the machine was built to do, as published. Not results, and never ranked.

Design values for Clinch River Nuclear Site Unit 1
ParameterValueUnit StatusSource
Thermal capacity (rated) medium confidence 870 MW MW planned Tennessee Valley Authority; Clinch River Nuclear Site, Unit 1; Notice of Hearing (FR Doc 2026-13662) independent