Groves Isotope Test Reactor
A low-power Oklo test reactor for radioisotope production methods in Lockhart, Texas, authorised by the DOE Reactor Pilot Program. Oklo reports DOE startup authorisation on 23 July 2026 and first criticality on 5 August 2026.
Results
None recorded.