Linglong One demonstration unit, Changjiang
also Linglong One, ACP100 demonstration, 玲龙一号
CNNC's first ACP100 (Linglong One) small modular pressurised-water reactor, under construction at the Changjiang nuclear site in Hainan since 13 July 2021. Primary-circuit cold functional testing was completed in October 2025.
Design values
What the machine was built to do, as published. Not results, and never ranked.
| Parameter | Value | Unit | Status | Source |
|---|---|---|---|---|
| Thermal capacity (rated) medium confidence | 385 MW | MW | planned | China National Nuclear Corporation aggregator |