Skip to content
FusionBenchmark
ITER Organization — image published by the organisation
Published by ITER Organization source ↗
ITER Organization

ITER Organization

Sector
Fusion

163 in this dataset

Technology
Tokamak

10 developers pursuing it

Fuel
Deuterium–tritium
Headquarters
🇫🇷Saint-Paul-lez-Durance, FR

12 organisations in FR

Status
Active
Role
Consortium, Operator

What these terms mean

Every classification on this page, defined. These are controlled-vocabulary terms, so the same word means the same thing on every profile.

Consortium
A multi-party body pooling funding or facilities across organisations or states — ITER being the largest example.
Operator
Runs a facility, which may have been built by someone else.
Fusion
Organizations pursuing energy from nuclear fusion, and their dedicated supply chain.
Tokamak › › Tokamak
Doughnut-shaped magnetic confinement using a strong toroidal field plus a current driven through the plasma itself. The most-studied configuration, and the one ITER uses.
Deuterium–tritium
Lowest ignition threshold; 80% of energy in 14.1 MeV neutrons. The reference fuel for every near-term net-gain claim.

In ITER Organization’s own words

Quoted from the organisation’s own site as we archived it. Their description of themselves, not ours, and not a claim this site has checked.

Welcome to ITER, the largest energy research project on the planet. We offer guided tours for groups, individuals, schools and universities, and twice a year we open our doors to the public. Choose your visit option below!

Visitors must be 16 years of age and minors must be accompanied by a parent or guardian. Kids younger than 16 are not permitted on the ITER worksite. We make an exception on Open Doors Days when we allow children aged ten and above to visit the ITER worksite.

No. We organize visits during the workweek, Monday to Friday, between 9:00 and 16:00.

Where ITER Organization sits

Composed from records in this dataset, not from outside research. Every figure below is counted from what the site holds, so it moves when the data does.

ITER Organization is one of 10 organisations in this dataset pursuing tokamak.

It is one of 12 we hold in FR.

It operates 1 device in this dataset, none of which carries recorded performance figures.

Related organisations

Others pursuing the same approach, then others in the same country.

Measured results

Results recorded on this operator’s devices. Design parameters — bore, field, dimensions — are excluded: a machine’s size is not something it achieved. 3 design parameters are held on the device pages.

Measured results for ITER Organization
DeviceMetric ValueStatusSource
ITER Plasma gain (Q_plasma)per External heating power coupled into the plasma 10 planned The machine
ITER Plasma current 15 MA planned World Survey of Fusion Devices 2022
ITER Plasma duration 3000 s planned World Survey of Fusion Devices 2022
ITER Fusion triple product (nTτ_E) 7.4 × 10²¹ m⁻³·keV·s planned Continuing progress toward fusion energy breakeven and gain as measured against the Lawson criteria
ITER Ion temperature 20 keV planned Continuing progress toward fusion energy breakeven and gain as measured against the Lawson criteria
ITER Plasma density 10²⁰ m⁻³ planned Continuing progress toward fusion energy breakeven and gain as measured against the Lawson criteria
ITER Energy confinement time (τ_E) 3.7 s planned Continuing progress toward fusion energy breakeven and gain as measured against the Lawson criteria

Devices operated 1

Pursuing the same technology

Others in this dataset working on Tokamak.

Sources

A source marked operator is the subject’s own publication. That is legitimate, and it is not independent confirmation. Methodology.